Welcome to Shenzhen Zhongjing Global Purification Technology Co., Ltd.!
backtrackCurrent location:Home / Engineering / Cosmetic GMP purification workshop
Author: Shenzhen Zhongjing Global Purification Technology Co., Ltd.Time:2018-07-26 11:28:24Views:1973
Lipstick blush eye shadow purification workshop, clean room floor should be smooth, wear-resistant, non-slip, easy to clean and disinfect, the surface of the work area to be cleaned should have slope, no water; the ceiling of the purification workshop should be light, corrosion-resistant, resistant Heat, moisture-proof, mildew-proof materials should be lining, and should be easy to clean. The height of the waterproof layer should not be less than 1.5 meters; the staff and materials must pass through the buffer zone or be sent to the production workshop; the production area must have a dressing room, and the room should have Dressing sets such as wardrobes and shoe racks should be equipped with mobile hand washing and disinfection facilities.
The semi-finished storage room, the filling room, the cleaning container storage room, the dressing room and the buffer zone must have air purification or air disinfection facilities; the purification workshop adopting the air purification device should have the air inlet away from the air outlet, and the air inlet is not higher than the ground height. Less than 2 meters, there must be no sources of pollution nearby.